Stardew Valley Machine Time Comparison (Minutes)

Compare Stardew Valley machine times. Furnace, keg, jar and maker times from Wiki to plan daily chores and farm layout listed here. Includes tables and sources.

Visual comparison

Log scale: values span 333.3x from smallest to largest, so bar lengths are logarithmic. Labels and table show exact values.

Keg Wine10,000 Minutes
Bee House Honey6,400 Minutes
Preserves Jar4,000 Minutes
Keg Beer1,750 Minutes
Oil Maker Corn Oil1,000 Minutes
Oil Maker Truffle Oil360 Minutes
Furnace Gold Bar300 Minutes
Loom Cloth240 Minutes
Cheese Press200 Minutes
Mayonnaise Machine180 Minutes
Furnace Iron Bar120 Minutes
Furnace Copper Bar30 Minutes

All values

Click any row to load it as Entry A.

NameValueContextSource

About this converter

Stardew Valley machines run on in game minutes. One full day gives 1,600 processing minutes. Day time runs at 60 minutes per hour and night time from 2am to 6am runs at 100 minutes per hour. A Furnace makes a copper bar in 30 minutes and an iron bar in 120 minutes. A Cheese Press needs 200 minutes. A Mayonnaise Machine needs 180 minutes. A Loom needs 240 minutes. A Preserves Jar needs 4,000 minutes. Long timers span several days.

How to use it

Pick two entries and a unit in the top row. The three boxes below stay linked. Change any box and the other two update. Put Furnace Copper in the first box and Preserves Jar in the second box. Keep the unit as Minutes or switch to Hours. Change a box to see how many cheese cycles fit in one jar cycle.

Times here match the Stardew Valley Wiki. Furnace gold takes 300 minutes. Truffle oil takes 360 minutes and corn oil takes 1,000 minutes. Keg beer takes 1,750 minutes and wine takes 10,000 minutes. Bee House honey takes about 4 days, shown as 6,400 minutes. Sleep time still counts at the night rate. Machines can be stacked in chests. Check the Keg and Preserves Jar pages for start time charts.

FAQ

How are machine minutes counted?

One day gives 1,600 processing minutes. Day hours run at 60 minutes per hour. Night hours from 2am to 6am run at 100 minutes per hour.

How long do the Preserves Jar and Keg take?

The Preserves Jar needs 4,000 minutes for most goods and 6,000 minutes for sturgeon caviar. The Keg needs 1,750 minutes for beer and 10,000 minutes for wine.

How long do the Furnace and Oil Maker take?

The Furnace needs 30 minutes for copper, 120 minutes for iron, and 300 minutes for gold. The Oil Maker needs 360 minutes for truffle oil and 1,000 minutes for corn oil.

How does the Bee House work?

The Bee House gives wild honey every 4 days, shown here as 6,400 minutes. Flower type changes with nearby blooms.

Sources

  • Stardew Valley Wiki Furnace, Keg, Oil Maker, Cheese Press, Preserves Jar
  • Stardew Valley Wiki Artisan Goods Processing Time

Last verified: 2026-10-02 · 12 entries

More power levels converters

Power Levels

Aardman Movie Runtime Comparison (Minutes)

Compare 9 Aardman runtimes in minutes, from the 79 minute Vengeance Most Fowl to the 97 minute Arthur Christmas. Studio data in a linked tool. right now.

Aardman · 9 entries
Power Levels

Advance Wars CO Power Star Comparison

Compare 16 Advance Wars CO power stars: Colin 2, Andy 3, Sami 3, Drake 4, Kanbei 4, Eagle 5, Hawke 5 and more. AW1 plus AW2 values. See full CO table here now.

Advance Wars · 16 entries

← Stardew Valley Keg Processing Time Comparison (Minutes) · Stardew Valley Mineral Price Comparison (Sell Gold) →