Largest Power Stations Capacity Comparison (MW)

Compare the 10 largest power stations by nameplate capacity, from Three Gorges at 22,500 MW to Krasnoyarsk at 6,000. MW totals with operator sources listed.

Visual comparison

Linear scale: bar lengths are directly proportional to value, relative to the largest entry.

Three Gorges Dam22,500 Megawatts (MW)
Baihetan Dam16,000 Megawatts (MW)
Itaipu Dam14,000 Megawatts (MW)
Xiluodu Dam13,860 Megawatts (MW)
Belo Monte Dam11,233 Megawatts (MW)
Guri Dam10,235 Megawatts (MW)
Tucurui Dam8,370 Megawatts (MW)
Grand Coulee Dam6,809 Megawatts (MW)
Longtan Dam6,426 Megawatts (MW)
Krasnoyarsk Dam6,000 Megawatts (MW)

All values

Click any row to load it as Entry A.

NameValueContextSource

About this converter

Three Gorges runs 22,500 MW nameplate, 6,500 clear of Baihetan at 16,000. Itaipu at 14,000, Xiluodu at 13,860, Belo Monte at 11,233 and Guri at 10,235 follow. Tucurui at 8,370, Grand Coulee at 6,809, Longtan at 6,426 and Krasnoyarsk at 6,000 close the table. Nameplate means max turbine sum, not yearly output. Rivers decide rank here since all 10 are hydro. Annual energy crowns shift with rainfall even when nameplate order holds.

How to use it

Pick two stations and a unit in the top row. The three boxes below stay linked. Change any box and the other two update. Try Three Gorges against Grand Coulee to see the triple gap. The bars below scale to Three Gorges so Krasnoyarsk looks thin next to it. Switch the unit to gigawatts for short figures. Ratios are exact divisions of the nameplate totals.

Nameplate vs output splits this table. Itaipu often beats Three Gorges in yearly energy on steadier river flow despite lower nameplate. Belo Monte runs seasonal with lower firm output than its 11,233 suggests. Figures follow operator nameplates. New units add megawatts, so totals move with commissioning.

FAQ

What is the largest power station?

Three Gorges at 22,500 MW nameplate. Baihetan follows at 16,000.

Is nameplate the same as output?

No. Nameplate is max sum. Yearly energy follows river flow, so Itaipu often tops Three Gorges per year.

What is the largest in the US?

Grand Coulee at 6,809 MW. Eighth here.

Are all top 10 hydro?

Yes. No thermal or nuclear station reaches 6,000 MW single site nameplate.

Sources

  • Operator nameplates: Three Gorges 22,500; Baihetan 16,000; Itaipu 14,000; Xiluodu 13,860; Belo Monte 11,233; Guri 10,235; Tucurui 8,370; Grand Coulee 6,809; Longtan 6,426; Krasnoyarsk 6,000 MW

Last verified: 2026-10-09 · 10 entries

More power levels converters

Power Levels

Aardman Movie Runtime Comparison (Minutes)

Compare 9 Aardman runtimes in minutes, from the 79 minute Vengeance Most Fowl to the 97 minute Arthur Christmas. Studio data in a linked tool. right now.

Aardman · 9 entries
Power Levels

Advance Wars CO Power Star Comparison

Compare 16 Advance Wars CO power stars: Colin 2, Andy 3, Sami 3, Drake 4, Kanbei 4, Eagle 5, Hawke 5 and more. AW1 plus AW2 values. See full CO table here now.

Advance Wars · 16 entries

← Largest City Plazas Area Comparison (Square M) · Largest Rivers Discharge Comparison (m3/s Average) →